CONVERSION

Removal of 120 t of steel from vessel such as old winches, side board, funnel structure. Adding and renewal of 135t of new structural steel such as new funnel construction, ramp, A-Frame, flush hatch and bulwark for fish nets. New hydraulic pipe connections to new hydraulic operated winches such as 42 t fish net handler, gilson winches and sweep line winches, have been installed on board. All rutine docking works, class renewal docking items have been completed and new fish finding eco sounder has been installed. Factory equipment for fish cutting, sorting, packing and stainless steel tanks have been installed on upper& lower processing areas.